News

Lwart Lubrificantes- Lençóis Paulista São Paulo Catalysts Change out of Reactors 131R 801 / 802 / 803 / 804

On february 2017, NCR performed at LWART LUBRIFICANTES, the job of unloading and loading catalysts of reactors of BACK END 131 R-801/802/803/804, located at Lençois Paulista City at São Paulo State.

The catalysts unloading of this unit has a particularity to have a hidroblasting truck support cause the particularity of the catalysts that seems a hard sludge. The unloading of catalysts was performed by gravity.

The volumen of catalysts is 31 m3 of each reactor.

The job was concluded before the forecast scheduled date achieving the expectations of the client.

NCR achieved zero accident during the turnaround.

Unloading Loading